Contracting for water point construction: Provisional and final acceptance forms
Toolkit
Download
PDF (1.6 MB)
Water users require a mechanism for holding contractors to account in the construction of water points. Using these GWI forms gives the water user committee the opportunity to make a detailed inventory and quality assessment of the work completed by the contractor, to help ensure that the eventual construction adheres to the original design. We provide these clear and accessible forms for each of the four water point options (2 x boreholes, 2 x hand-dug wells), and signpost records of other important water point acceptance documents which should be made available to the user by the contractor.